knostropsludge.blogspot.com
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME: July 2007
http://knostropsludge.blogspot.com/2007_07_01_archive.html
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME. Friday, 20 July 2007. July Developments Part II. The concrete pours in the 2 day area were completed on July 20th involving Scarlet, one of the B&V subcontrators for this project. In the 21 day area, design of the connections was reconsidered with a manhole incorporated. Complex existing services below the ground were also found, presenting a temporary logistical nightmare which was later dealt with. Particular focus was given to meeting programme timescales. Subsc...
hullsludge.blogspot.com
HULL WWTW SLUDGE MANAGEMENT SCHEME: November 2007
http://hullsludge.blogspot.com/2007_11_01_archive.html
HULL WWTW SLUDGE MANAGEMENT SCHEME. Thursday, 1 November 2007. Over the next 5 weeks the new coarse screens are to be installed along with the associated screw conveyors and access structures. The temporary screens installed in the lamellas are to be removed this week. After alteration and refurbishment at Adams they will be returned to site and installed in the existing FFT chambers to screen FFT flows. Subscribe to: Posts (Atom). Health and Safety Executive. View my complete profile.
hullsludge.blogspot.com
HULL WWTW SLUDGE MANAGEMENT SCHEME: Current Activities
http://hullsludge.blogspot.com/2007/09/current-activities.html
HULL WWTW SLUDGE MANAGEMENT SCHEME. Friday, 28 September 2007. Subscribe to: Post Comments (Atom). Health and Safety Executive. View my complete profile. How often would you like to see this blog updated?
hullsludge.blogspot.com
HULL WWTW SLUDGE MANAGEMENT SCHEME: September 2007
http://hullsludge.blogspot.com/2007_09_01_archive.html
HULL WWTW SLUDGE MANAGEMENT SCHEME. Friday, 28 September 2007. Subscribe to: Posts (Atom). Health and Safety Executive. View my complete profile. How often would you like to see this blog updated?
knostropsludge.blogspot.com
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME: October 2007
http://knostropsludge.blogspot.com/2007_10_01_archive.html
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME. Wednesday, 31 October 2007. 21 Day Area Concrete Pouring. The base for tank 4 was poured on 26-10-07 and took until 3am with staff members enthusiasm highly commendable. The rebar for tank 3 was completed on the same day with the concrete to be poured on 01-11-07, completing all the concreting for that area. I am where I am because I believe in all possibilities". Friday, 19 October 2007. 2 Day Tank Area: Roof Lifted into Place. Act as if it were impossible to fail".
knostropsludge.blogspot.com
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME: June 2007
http://knostropsludge.blogspot.com/2007_06_01_archive.html
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME. Tuesday, 26 June 2007. Use of Recycled Imported Material. Use of recycled imported material and reuse of in situ excavated material:. Knostrop is the main Waste Water treatment Works serving the city of Leeds and the scheme is valued at circa £10m and programmed for completion over an 18 month period ending June 2008. A decision was made by the site management team to bring a licensed mobile concrete crusher on to site to crush the discovered demolition material...
knostropsludge.blogspot.com
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME: Construction Progress: March
http://knostropsludge.blogspot.com/2008/03/construction-progress-march.html
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME. Monday, 31 March 2008. TK58100 crack injection complete. Re-filling for water test ongoing. Cross site odour duct bases complete. TK62400 concrete repairs completed by A Consult. All ring beams are concreted. MCC21-2 is excavated and constructed, base complete and awaiting kiosk. Odour control unit base commenced and ongoing. PC pump base excavate and construct. Tank No.2- Concrete repairs to the existing tank complete in accordance with PMI.
knostropsludge.blogspot.com
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME: Construction Operations
http://knostropsludge.blogspot.com/2008/03/construction-operations.html
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME. Monday, 10 March 2008. 21 Day Tank Area: Panels and roof for tank 4 have been erected as well as pouring for ring beam. 70% of access steelwork erected. Blinding and trench base poured for MCC. Excavation and underslab ducts for pump slab and odour control slab. 2 Day Tank Area: Electrical above ground feed pipework and pipework around pumps, odour control duct, valves in manholes installed. Subscribe to: Post Comments (Atom). View my complete profile.
knostropsludge.blogspot.com
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME: September 2007
http://knostropsludge.blogspot.com/2007_09_01_archive.html
KNOSTROP WWTW SLUDGE MANAGEMENT SCHEME. Thursday, 20 September 2007. Team Building: 20th September 2007. In order to ensure the continuing quality of the Knostrop Odours project, a team building event was held at the Jurys Inn hotel in Leeds involving anyone with a vested interest in the project:. The world of achievement has always belonged to the optimist". Monday, 17 September 2007. Skelton Grange Environmental Volunteering: 17th September 2007. Http:/ www.skeltongrange.org.uk. View my complete profile.