allanconstruction.ca
Allan Construction
http://www.allanconstruction.ca/projects/utilities
Allan Construction is able to complete all its own Excavating and Backfilling required for any new and/or existing utility work with our own Equipment and Operators. We have several years experience in completing Electrical Ductbanks through out the City of Saskatoon and various Mine Sites. We own an Engineered Shoring System which we utilize for most of the Ductbank work. 138KV Substation - Civil Works. Lanigan Mine Site, SK. Rel="U2" style="width: 150px;" title=". City of Saskatoon - Duct Banks.
allanconstruction.ca
Allan Construction
http://www.allanconstruction.ca/projects/concrete
Allan Construction specializes in all aspects of concrete work including forming, casting, and finishing. The majority of our work includes, commercial/industrial and institutional. Service Shaft Head Frame &. BHP - Service Shaft Head Frame and Hoist Foundations. Earthworks, formwork, concrete casting and finishing for the Service Shaft Head Frame Foundations and Hoist Foundations. Approximately 10,000 m 3 of concrete cast and finished during this project. Head Frame Hoist Foundations. Http:/ www.all...
allanconstruction.ca
Allan Construction
http://www.allanconstruction.ca/projects/roadbuilding
Allan Construction does the complete roadway construction to the granular base level in accordance with the drawings and specifications. This involves earthworks, subgrade preparation, subbase gravel and base gravel. Highway 7 and 14 Interchange. Highway 7 and 14 Interchange. We completed this contract as a sub-trade for Central Asphalt. Our contract included all earthworks and the supply and installation of all granular subbase and base material. RM Road Fertile Valley / Milden.
allanconstruction.ca
Allan Construction
http://www.allanconstruction.ca/projects/waterworks
With our own trained operators and employees we are able to complete all Water/Sewer work for our projects. Brighton Pond Area Grading and Underground Utilities Project. Eastern Edge of Saskatoon. Dream Development - Brighton Pond. 500,000m3 of Area Grading and Pond Construction 644 lm of Storm Utilities, Control Chamber and manholes. Jasper Avenue Lift Station. City of Saskatoon - Jasper Avenue Lift Station. Constructed then sank a new 2000sf Lift station 50’ into the ground. Cargill - Fireline Project.
allanconstruction.ca
Allan Construction
http://www.allanconstruction.ca/company
Locally owned and operated General Contracting firm, specializing in all aspects of Civil, industrial and Commercial projects. Whether its a small building renovation, a project-financed infrastructure development, or a complex industrial fabrication project, Allan Construction prides itself in being able to handle virtually any challenge for our clients. The first is our unwavering commitment to performing the highest quality of work for our customers. The company currently operates as a Construction Pa...
allanconstruction.ca
Allan Construction
http://www.allanconstruction.ca/projects/generalcontracting
As a General Contractor, we will provide an Owner / Client with a tendered price to complete all work in accordance to the engineered drawings and specifications. We will also provide competent project managers and site superintendent to manage and complete the project. Avenue P Medical Office Building. Avenue P Medical Office Building. Construction of a Four Storey Concrete Building and Parkade. Island Falls - Switching Station - Civil Works. Island Falls, SK. Supply and installation of pre-cast trenches.
allanconstruction.ca
Allan Construction
http://www.allanconstruction.ca/projects/piling
The Deep Foundations Division specializes in the Design and Installation of Driven, Steel pipe with Helices and the Construction of Bored Piles. Ave P Medical Office Building. Ave P Medical Office Building. Design and installation of 75 soldier piles for temporary shoring. Spadina Lift Station Bypass Building. Design and installation of 65 soldier piles for temporary shoring. Highways 219 and 15 Bridge Replacements. Highways 219 and 15. Ministry of Highways and Infrastructure. Agrium Vanscoy, SK. Http:/ ...
allanconstruction.ca
Allan Construction
http://www.allanconstruction.ca/projects/earthworks
Allan Construction has an extensive fleet of Light Duty and Power Mobile Equipment that continues to grow and improve every year. We are able to complete all Earthworks with our own Equipment and Trained Operators. We have Topcon GPS installed on our Power Mobile Equipment which now enables us to excavate and place all subbase and base to the specified depths with accurate precision. Patience Lake, SK. PCS Patience - Injection Expansion. CP Rail - Arpiers. CP Rail - Arpiers. Eastern Edge of Saskatoon.
allanconstruction.ca
Allan Construction
http://www.allanconstruction.ca/projects
Allan Construction has completed over 2,000 projects of various sizes and scopes through out our history. A small overview of some of our projects will be highlighted in the below categories. If you require any further information or clarification, do not hesitate to contact us directly. 317 103rd Street East Saskatoon SK S7N 1Y9.
allanconstruction.ca
Allan Construction
http://www.allanconstruction.ca/careers
Our people are the cornerstone of our success and we are committed to fostering a strong culture based upon honesty, trust, respect, fairness, and accountability. Resumes can be sent by email to. Or by fax to 306-477-5521. Success for Allan Construction is directly tied to the quality and the ability of our employees. We encourage all our employees to continue to improve their education by entering into trade schools, colleges or local universities. 317 103rd Street East Saskatoon SK S7N 1Y9.