farkelwestfrontyard.blogspot.com farkelwestfrontyard.blogspot.com

farkelwestfrontyard.blogspot.com

Front Yard

Wednesday, July 16, 2008. The front yard.yep.needs work too. Bush removal, porch renovation, and the addition of a few trees and plants. These changes might take longer as we will be focusing on the interior to be able to move in, but for some ideas check out the 3D renderings section. Subscribe to: Posts (Atom). Email us: Gregg and Abbey.

http://farkelwestfrontyard.blogspot.com/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR FARKELWESTFRONTYARD.BLOGSPOT.COM

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

September

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Wednesday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 4.1 out of 5 with 16 reviews
5 star
8
4 star
5
3 star
1
2 star
0
1 star
2

Hey there! Start your review of farkelwestfrontyard.blogspot.com

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

0.3 seconds

FAVICON PREVIEW

  • farkelwestfrontyard.blogspot.com

    16x16

  • farkelwestfrontyard.blogspot.com

    32x32

  • farkelwestfrontyard.blogspot.com

    64x64

  • farkelwestfrontyard.blogspot.com

    128x128

CONTACTS AT FARKELWESTFRONTYARD.BLOGSPOT.COM

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
Front Yard | farkelwestfrontyard.blogspot.com Reviews
<META>
DESCRIPTION
Wednesday, July 16, 2008. The front yard.yep.needs work too. Bush removal, porch renovation, and the addition of a few trees and plants. These changes might take longer as we will be focusing on the interior to be able to move in, but for some ideas check out the 3D renderings section. Subscribe to: Posts (Atom). Email us: Gregg and Abbey.
<META>
KEYWORDS
1 the front yard
2 posted by
3 farkel west
4 no comments
5 thoughts
6 suggestions
7 site navigation
8 main page
9 floor plans
10 3d renderings
CONTENT
Page content here
KEYWORDS ON
PAGE
the front yard,posted by,farkel west,no comments,thoughts,suggestions,site navigation,main page,floor plans,3d renderings,master bedroom,master bathroom,dining room,bedroom,living room,kitchen,bathroom,garage / workshop,back yard,front yard,main archive
SERVER
GSE
CONTENT-TYPE
utf-8
GOOGLE PREVIEW

Front Yard | farkelwestfrontyard.blogspot.com Reviews

https://farkelwestfrontyard.blogspot.com

Wednesday, July 16, 2008. The front yard.yep.needs work too. Bush removal, porch renovation, and the addition of a few trees and plants. These changes might take longer as we will be focusing on the interior to be able to move in, but for some ideas check out the 3D renderings section. Subscribe to: Posts (Atom). Email us: Gregg and Abbey.

INTERNAL PAGES

farkelwestfrontyard.blogspot.com farkelwestfrontyard.blogspot.com
1

Front Yard: The Front Yard...

http://www.farkelwestfrontyard.blogspot.com/2008/07/blog-post.html

Wednesday, July 16, 2008. The front yard.yep.needs work too. Bush removal, porch renovation, and the addition of a few trees and plants. These changes might take longer as we will be focusing on the interior to be able to move in, but for some ideas check out the 3D renderings section. Subscribe to: Post Comments (Atom). Email us: Gregg and Abbey.

2

Front Yard: July 2008

http://www.farkelwestfrontyard.blogspot.com/2008_07_01_archive.html

Wednesday, July 16, 2008. The front yard.yep.needs work too. Bush removal, porch renovation, and the addition of a few trees and plants. These changes might take longer as we will be focusing on the interior to be able to move in, but for some ideas check out the 3D renderings section. Subscribe to: Posts (Atom). Email us: Gregg and Abbey.

UPGRADE TO PREMIUM TO VIEW 0 MORE

TOTAL PAGES IN THIS WEBSITE

2

LINKS TO THIS WEBSITE

kawecki.us kawecki.us

Farkel West: April 2009

http://www.kawecki.us/2009_04_01_archive.html

Tuesday, April 7, 2009. I know that it has been a long time since the last post, but the past three weeks have been the big race to the finish, and WE MADE IT! The stucco was finished, the water heater hooked up, and the floors uncovered; not to mention the boxes and boxes that were moved in, my truck breaking down again, and the film crew shooting in the garage! But with all that, we still spent our first night in the new house on Saturday March 28! And here is the bathroom now! We found the curtain for...

farkelwestgarage.blogspot.com farkelwestgarage.blogspot.com

Garage / Workshop: July 2008

http://farkelwestgarage.blogspot.com/2008_07_01_archive.html

Thursday, July 17, 2008. The dejected garage.complete with.skylight? It has been some time since this space has seen love, but soon it will be the heart of renovation operations. Two full size bays, with high ceilings, this is a huge space! Once the roof is fixed, trees are cut away, and new door is installed; this space will house the workshop and tools for this and future projects. Plans are to replace the door with an 8' sliding barn style door leading into the workshop. Subscribe to: Posts (Atom).

kawecki.us kawecki.us

Farkel West: June 2009

http://www.kawecki.us/2009_06_01_archive.html

Tuesday, June 30, 2009. From fire pit to sidewalk. Remember that old fire pit in the back yard? It is long gone, but now the bricks have found their way to the front yard. After 25 bags of gravel and 60 bags of sand, I started to lay the old bricks in place. The supply was supplemented by more old bricks found on craigslist. We wanted to use the old bricks so that the new walk didn't look too new. Monday, June 8, 2009. Tuesday, June 2, 2009. And green and green and green. The lawn is starting to fill in!

kawecki.us kawecki.us

Farkel West: January 2009

http://www.kawecki.us/2009_01_01_archive.html

Wednesday, January 28, 2009. It has been a very busy week. Last week the new front door came in and we installed the new front entry. First we removed the old windows and door, and then we reframed the front wall to house our new door. Originally we were not expecting the new door until the 30th, but they called and told us it was ready for pick up the same day that we started the work! Here are a few shots of the old wall coming down. This week we have been finishing the plaster and drywall work inside&...

kawecki.us kawecki.us

Farkel West: November 2008

http://www.kawecki.us/2008_11_01_archive.html

Wednesday, November 19, 2008. New Ideas, More Demo, Some New Framing, and Power! In the kitchen, but Abbey has given me some cautious optimism about the color and look of the new fluorescent lights. We shall see! Today I helped Javier (our carpenter and plumber) to install the new floor joist in the bathroom. The drains throughout the house are nearly complete and tomorrow he is going to start putting the new copper piping. We will probably be getting our new Tankless Water Heater. Now, about that kitchen.

kawecki.us kawecki.us

Farkel West: March 2009

http://www.kawecki.us/2009_03_01_archive.html

Monday, March 16, 2009. President Obama to visit Southern California Edison. Earlier today all SCE employees were informed that President Obama will be visiting the company on Thursday. To: Edison International Employees. Corporate Communications and the White House will handle responses to inquiries. This visit is a reflection of the outstanding work so many of you do every day. We are honored that the President has chosen our company for this visit. Ted Craver, EIX CEO. That we chose to seal up the dry...

kawecki.us kawecki.us

Farkel West: May 2009

http://www.kawecki.us/2009_05_01_archive.html

Tuesday, May 26, 2009. It has been a week since we seeded the lawn and we are now starting to see the results of our efforts! The lawn is starting to come in. We are still on a twice a day watering routine but hopefully we can start to cut that back soon. Here are a few shots of the progress! Last week I also picked up 300 more bricks, so we should now have enough to do the front walkway! More to come soon! Friday, May 15, 2009. A little light, a little color, a lot of dirt. Over the past few weeks, we s...

kawecki.us kawecki.us

Farkel West: December 2010

http://www.kawecki.us/2010_12_01_archive.html

Thursday, December 16, 2010. New K Jr. Pictures! Had our second trimester anatomical ultrasound on Tuesday and everything checked out great! The tech even saw what we are having! And it is .a.surprise! Still We were able to hold out, so it will be a few more months before we know! Here are some of the latest pics! And here are a few cool 3D shots! More to come soon! Sunday, December 12, 2010. Farkel West expansion project. Coming this spring is the first expansion of the Kawecki Family!

kawecki.us kawecki.us

Farkel West: July 2008

http://www.kawecki.us/2008_07_01_archive.html

Thursday, July 17, 2008. So here it is. Our new website! This will be our site for news about us, our families, and our lives. Primarily focused of course on our new house! Please enjoy the updates as we begin to build and journey with us through the next few years as we head toward completion! What is happening now? Well, to catch everyone up, I am still working on completing my commercial days for the DGA (only 20 more to go! Well, almost no one. There was of course Abbey's father who had just visi...

UPGRADE TO PREMIUM TO VIEW 53 MORE

TOTAL LINKS TO THIS WEBSITE

62

OTHER SITES

farkelwestbackyard.blogspot.com farkelwestbackyard.blogspot.com

Backyard

Sunday, November 2, 2008. A day of brush clearing. We actually have a driveway! The tree looks a lot better and is no longer attacking the garage roof! Now we just need the dumpster to get rid of all of this stuff! Thursday, July 17, 2008. The Backyard.before planting. And Abbey can't wait to start planting. Oh yeah.did we mention there is plenty of room for dog(s) to run? Subscribe to: Posts (Atom). Email us: Gregg and Abbey. A day of brush clearing.

farkelwestbathroom.blogspot.com farkelwestbathroom.blogspot.com

Bathroom

Saturday, November 1, 2008. Thursday, July 17, 2008. The Downstairs Bathroom - Prior to Renovation. Seems small at first, but once the tub is removed and the wall pushed out to make room for a shower where the water heater is currently rusting outside, this downstairs bathroom should be fine. The room will be gutted and the plumbing redone to accommodate the master bathroom plumbing in the add on room above. (see 3d Renderings). And oh yeah. the yellow seat is already long gone! Subscribe to: Posts (Atom).

farkelwestbedroom1.blogspot.com farkelwestbedroom1.blogspot.com

Bedroom

Wednesday, July 16, 2008. Not much changing here, just new doors, building closets, and refinishing the floor. Subscribe to: Posts (Atom). Email us: Gregg and Abbey.

farkelwestdiningroom.blogspot.com farkelwestdiningroom.blogspot.com

Dining Room

Wednesday, July 16, 2008. Don't let the kitchen fool you. The original kitchen will be removed and the wall taken down to create the new dining room space. Subscribe to: Posts (Atom). Email us: Gregg and Abbey. Dont let the kitchen fool you.

farkelwestfloorplans.blogspot.com farkelwestfloorplans.blogspot.com

Farkel West Floor Plans

Wednesday, July 16, 2008. Subscribe to: Posts (Atom). Email us: Gregg and Abbey.

farkelwestfrontyard.blogspot.com farkelwestfrontyard.blogspot.com

Front Yard

Wednesday, July 16, 2008. The front yard.yep.needs work too. Bush removal, porch renovation, and the addition of a few trees and plants. These changes might take longer as we will be focusing on the interior to be able to move in, but for some ideas check out the 3D renderings section. Subscribe to: Posts (Atom). Email us: Gregg and Abbey.

farkelwestgarage.blogspot.com farkelwestgarage.blogspot.com

Garage / Workshop

Thursday, July 17, 2008. The dejected garage.complete with.skylight? It has been some time since this space has seen love, but soon it will be the heart of renovation operations. Two full size bays, with high ceilings, this is a huge space! Once the roof is fixed, trees are cut away, and new door is installed; this space will house the workshop and tools for this and future projects. Plans are to replace the door with an 8' sliding barn style door leading into the workshop. Subscribe to: Posts (Atom).

farkelwestkitchen.blogspot.com farkelwestkitchen.blogspot.com

Kitchen

Saturday, November 1, 2008. Tuesday, October 28, 2008. We have redesigned the main floor plan for the house and are now going to remodel and expand the kitchen in the front of the house. Here are some new renderings of the new kitchen design. Thursday, July 17, 2008. Yeahthat's what we thought too! This kitchen is OLD! And without a doubt going away. Believe it or not, the gas range still works! This is where the kitchen will be. Subscribe to: Posts (Atom). Email us: Gregg and Abbey.

farkelwestlivingroom.blogspot.com farkelwestlivingroom.blogspot.com

Living Room

Thursday, July 17, 2008. The Living Room - prior to renovation. This room has great high ceilings, but we will be lowering them slightly in order to free up the space under the "stage" in the upstairs master bedroom. Subscribe to: Posts (Atom). Email us: Gregg and Abbey. The Living Room - prior to renovation.

farkelwestmasterbath.blogspot.com farkelwestmasterbath.blogspot.com

Master Bathroom

Wednesday, July 16, 2008. Master Bathroom - somewhere here. The space for the master bathroom does not yet exist. In the 3D Rendering section you can see that the upstairs dormer is going to be extended out over the downstairs bathroom, creating a large space off the master bedroom for the master bath. Subscribe to: Posts (Atom). Email us: Gregg and Abbey. Master Bathroom - somewhere here.

farkelwestmasterbedroom.blogspot.com farkelwestmasterbedroom.blogspot.com

Master Bedroom

Wednesday, July 16, 2008. Upstairs Attic Space - Prior to demo and renovation. The large attic space will be gutted and renovated to become the master bedroom suite.  The room currently has a hanging ceiling, but when removed the space will have a large open ceiling.  . In the corner, a stage covers the ceiling structure of the high ceiling living room below. The ceiling in the living room will be lowered to open this space up in the upstairs room. Subscribe to: Posts (Atom). Email us: Gregg and Abbey.