Green Mount

Tuesday, 6 August 2013. Mass concrete works have been completed to the retaining wall and the facing stonework has been laid ready for coping stones. Kerbing and hard landscaping works are progressing to the front of Block 1 and adjacent to Block 2. Friday, 21 June 2013. Excavations ,steel fixing and concrete pour for the retaining wall are now completed. The g. As trench is now excavated and g. As, water and electric are now connected to all plots. Monday, 22 April 2013. Monday, 8 April 2013. The stone ...

http://wates-green-mount.blogspot.com/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR WATES-GREEN-MOUNT.BLOGSPOT.COM

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

January

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Sunday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 4.3 out of 5 with 13 reviews
5 star
8
4 star
3
3 star
1
2 star
0
1 star
1

Hey there! Start your review of wates-green-mount.blogspot.com

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

1 seconds

FAVICON PREVIEW

  • wates-green-mount.blogspot.com

    16x16

  • wates-green-mount.blogspot.com

    32x32

  • wates-green-mount.blogspot.com

    64x64

  • wates-green-mount.blogspot.com

    128x128

CONTACTS AT WATES-GREEN-MOUNT.BLOGSPOT.COM

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
Green Mount | wates-green-mount.blogspot.com Reviews
<META>
DESCRIPTION
Tuesday, 6 August 2013. Mass concrete works have been completed to the retaining wall and the facing stonework has been laid ready for coping stones. Kerbing and hard landscaping works are progressing to the front of Block 1 and adjacent to Block 2. Friday, 21 June 2013. Excavations ,steel fixing and concrete pour for the retaining wall are now completed. The g. As trench is now excavated and g. As, water and electric are now connected to all plots. Monday, 22 April 2013. Monday, 8 April 2013. The stone ...
<META>
KEYWORDS
1 posted by
2 wates team
3 no comments
4 email this
5 blogthis
6 share to twitter
7 share to facebook
8 share to pinterest
9 block 1
10 fix stage upstairs
CONTENT
Page content here
KEYWORDS ON
PAGE
posted by,wates team,no comments,email this,blogthis,share to twitter,share to facebook,share to pinterest,block 1,fix stage upstairs,fix m&e,older posts,or e mail,jodiewalker@wates co uk,blog archive,october
SERVER
GSE
CONTENT-TYPE
utf-8
GOOGLE PREVIEW

Green Mount | wates-green-mount.blogspot.com Reviews

https://wates-green-mount.blogspot.com

Tuesday, 6 August 2013. Mass concrete works have been completed to the retaining wall and the facing stonework has been laid ready for coping stones. Kerbing and hard landscaping works are progressing to the front of Block 1 and adjacent to Block 2. Friday, 21 June 2013. Excavations ,steel fixing and concrete pour for the retaining wall are now completed. The g. As trench is now excavated and g. As, water and electric are now connected to all plots. Monday, 22 April 2013. Monday, 8 April 2013. The stone ...

INTERNAL PAGES

wates-green-mount.blogspot.com wates-green-mount.blogspot.com
1

Green Mount: June 2013

http://www.wates-green-mount.blogspot.com/2013_06_01_archive.html

Friday, 21 June 2013. Excavations ,steel fixing and concrete pour for the retaining wall are now completed. The g. As trench is now excavated and g. As, water and electric are now connected to all plots. Subscribe to: Posts (Atom). Click above for more information on Wates Group Ltd. Click above for more information on Kirklees Excellent Homes for Life. Our sites are registered with the Considerate Constructors Scheme. Click above for more information on the scheme. Call us (Freephone) on.

2

Green Mount: February 2013

http://www.wates-green-mount.blogspot.com/2013_02_01_archive.html

Thursday, 28 February 2013. Monday, 18 February 2013. The timber frames to the two smaller blocks are now all-but complete. The next process to these blocks will be the roof finishes and installation of the windows and external doors as well as the external stone-work. Timber frame to the larger block, nearest to Wakefield Road, will be progressing this week so that the whole building plots can be seen in relation to the whole site. Monday, 4 February 2013. Subscribe to: Posts (Atom). Our sites are regis...

3

Green Mount: October 2012

http://www.wates-green-mount.blogspot.com/2012_10_01_archive.html

Monday, 22 October 2012. We would like to take this opportunity to introduce ourselves as Wates Living Space. We are a Building Contractor working in conjunction with Kirklees Council, and have been appointed to build 14 new homes on the vacant piece of land on Green Mount, Moldgreen,. This development is part of the Kirklees Excellent Homes for Life project, which will build 466 new homes for rent across Kirklees. Construction works commenced on. Monday 8 October 2012. The site is due for completion on.

4

Green Mount

http://www.wates-green-mount.blogspot.com/2013/03/block-1-this-week-has-been-very.html

Friday, 15 March 2013. This week has been very productive with our roofers working through the wind of the first few days to get the felt and battens on and load the tiles out for laying. A couple of weeks will see the roof complete. This will leave our Plumber to fit the Gutters and Rain Water Pipes. Blocks 2 and 3. The external stone work is up past first floor, and the internal walls have been erected ready for First Fixing the M&E. Note: only a member of this blog may post a comment.

5

Green Mount

http://www.wates-green-mount.blogspot.com/2013/06/excavations-steel-fixing-and-concrete.html

Friday, 21 June 2013. Excavations ,steel fixing and concrete pour for the retaining wall are now completed. The g. As trench is now excavated and g. As, water and electric are now connected to all plots. Note: only a member of this blog may post a comment. Subscribe to: Post Comments (Atom). Click above for more information on Wates Group Ltd. Click above for more information on Kirklees Excellent Homes for Life. Call us (Freephone) on. Excavations ,steel fixing and concrete pour for t.

UPGRADE TO PREMIUM TO VIEW 11 MORE

TOTAL PAGES IN THIS WEBSITE

16

OTHER SITES

wates-burgh-mill-gardens.blogspot.com wates-burgh-mill-gardens.blogspot.com

Burgh Mill Gardens

Monday, 22 April 2013. External groundworks are now underway with the installation of Drainage and Statutory services to the plots. Can we please ask all local residents to remind their children to not enter the site on a evenings and weekends. Thank you. Friday, 5 April 2013. Drainage works have progressed well this week, along with the commencement of the last two retaining walls which will then form the car park along the front of the flats. Wednesday, 13 March 2013. Monday, 4 March 2013. First fix bo...

wates-centenary-way.blogspot.com wates-centenary-way.blogspot.com

Centenary Way

Monday, 23 December 2013. The Wates team and our sub-contractors would like to thank you for your continued patience whilst we have been on site at Centenary Way. Our site will close for the Christmas period on Tuesday 24 December, and will re-open in the New Year on Thursday 2 January. Can we also take this opportunity to wish you a Merry Christmas and a Happy New Year! Friday, 29 November 2013. Friday, 25 October 2013. Friday, 11 October 2013. Externally this week the bricklayers and renderers complete...

wates-field-head.blogspot.com wates-field-head.blogspot.com

Field Head

Monday, 4 March 2013. The deep drainage is now complete and the Hydro Brake cast in-situ manhole is ready to be concreted. The car parking bays have been formed and the block Pavia to this area completed. Also prepared are the cycle shed base and the bin store base. The boundary wall has been constructed just leaving the tango fencing to be fixed to it. Friday, 15 February 2013. Our first floor flats are ready to be handed over to the decorators, just got to fill the systems with water and check for leak...

wates-foldings-avenue.blogspot.com wates-foldings-avenue.blogspot.com

Foldings Avenue

Friday, 2 August 2013. Tuesday, 25 June 2013. Friday, 21 June 2013. We are only a few weeks from completion at Foldings Avenue, as you can see the internal finishes are 95% complete to both blocks, the external hard and soft landscaping is the current priority, however we a confident with a run of good weather this will be finished in the next week or so. Wednesday, 10 April 2013. Wednesday, 20 February 2013. Progress has been slow in January due to the adverse weather and cold temperatures, however Febr...

wates-former-fairfield-school.blogspot.com wates-former-fairfield-school.blogspot.com

Former Fairfield School

Thursday, 10 October 2013. We have come a long way since the blog has been down. With only weeks to go before handover the internal are almost complete. As you can see with the photos, the first and second floor are complete, only leaving the main entrance corridor to decorate. We are having the final push on the externals and the temporary car park being replaced back to the original state before we arrived. Monday, 22 July 2013. Friday, 5 July 2013. Friday, 21 June 2013. The second phase of External Wo...

wates-green-mount.blogspot.com wates-green-mount.blogspot.com

Green Mount

Tuesday, 6 August 2013. Mass concrete works have been completed to the retaining wall and the facing stonework has been laid ready for coping stones. Kerbing and hard landscaping works are progressing to the front of Block 1 and adjacent to Block 2. Friday, 21 June 2013. Excavations ,steel fixing and concrete pour for the retaining wall are now completed. The g. As trench is now excavated and g. As, water and electric are now connected to all plots. Monday, 22 April 2013. Monday, 8 April 2013. The stone ...

wates-hare-park-grange.blogspot.com wates-hare-park-grange.blogspot.com

Hare Park Grange

Friday, 8 February 2013. The project is now complete after a seamless handover to Kirklees council on Thursday 7th February. The project was completed to a high quality standard both internally and externally with complimentary remarks from the client and clients representative. Another excellent project delivered from the Wates Kirklees Team. A big thankyou to all involved. Tuesday, 5 February 2013. Internally, we have nearly completed the snagging list produced by Kirklees Council. After the Christmas ...

wates-online.blogspot.com wates-online.blogspot.com

WATES-ONLINE (BLOGnya CAK IMAM)

Recomment to Your Friends.

wates-project-house.blogspot.com wates-project-house.blogspot.com

Project House

Wednesday, 18 September 2013. Friday, 23 August 2013. Externally British Gas laid the mains and fitted the meters. Northern power grid have commenced on site pulling the mains cable and next week will connect onto the existing services. Internally much the same as last week 2nd fix electrics fitting lights and sockets. Plumbers are connecting the sinks and fitting the showers in blocks 2 and 3, giving the plots a feel of completion with only the final decoration to do. Friday, 16 August 2013. On Block 1 ...

wates-projects.co.uk wates-projects.co.uk

DocElite by Finedata

Gloucestershire Police Authority Custody Centre). E-Mail : rob.brinsley@wates.co.uk. Telephone : 44 (0) 1454 615561. E-Mail : richard.turton@wates.co.uk. Telephone : 44 (0) 1454 615561. Click here to see other DocElite Portals. In order to use DocElite, you must have a valid User Name and Password. If you have them already, type them into the boxes below and click on the 'Enter DocElite'. DocElite has been tested and works with. Internet Explorer and FireFox.